image
image

Stage 1 Villas

Welcome to Wānaka Peaks’ first release—thoughtfully designed villas that celebrate the best of alpine village living. Choose from two or three bedrooms, every villa at Wānaka Peaks will balance luxury with practicality. Premium finishes meet genuine functionality, from generous storage for your outdoor gear to entertainment spaces that flow naturally between inside and out. Built to Homestar standards, these homes work with Wānaka’s environment, not against it.

2-3 Bedrooms
1.5-2 Bathrooms
Single or double garage
Stage
1
Status
Under construction, due for completion by mid-2026. Selling off plans^

Standard villas feature

  • Choice of spacious two or three-bedroom layouts, thoughtfully designed for comfort and elegance
  • Contemporary kitchen with generous storage and quality appliances
  • Open-plan living extending to private patio
  • Walk-in wardrobe and ensuite in master bedrooms
  • Underfloor heating in all bathrooms
  • Plentiful storage for everyday essentials and outdoor adventures
  • Single garage with internal access
  • Two-bedroom villas feature in-built laundry in garage
  • Three-bedroom villas feature separate laundry

Ultra premium villas feature

  • Spacious three-bedroom standalone villas that will sit on their own generous site
  • Expansive living areas with an elegant electric fireplace
  • Premium timber flooring with inset wool carpet in lounge
  • Designer kitchen with scullery and American Walnut cabinetry
  • Private outdoor patios with stunning mountain outlook
  • Master suite with walk-in wardrobe
  • Double garage with internal access
  • Ample storage for household essentials and outdoor pursuits
  • Outdoor patio with pergola

^ Price is for an Occupation Right Agreement secured by a first-ranking mortgage in favour of the statutory supervisor on behalf of the residents. All specifications are preliminary estimates based on the unit type to Metlifecare’s standard specifications and should be used as a guide only. All items are subject to availability, and substitutions or changes may be required. Currently under construction, expected to be available for move-in from mid-2026. Product images are artists impressions and are indicative only.